SCH Number 2010011062


Project Info

Title
Eastside Transit Corridor Phase 2 Project EA
Description
The Build Alternative is an electric-powered light rail transit service extension in eastern Los Angeles County. It would include approximately 4.7 miles of reconfigured and new light rail transit guideway, extending the Metro E Line east from its current terminus at Atlantic Boulevard to an at-grade terminal station at the proposed Greenwood station in the City of Montebello. The 4.7 mile alignment would include the reconfiguration of 0.4 mile of existing track to transition to a new 4.3 mile extension. This alternative would have approximately 3.1 miles of underground alignment, 0.9 miles of aerial alignment, and 0.7 miles of at-grade alignment; a relocated underground Atlantic/Pomona station; and three new stations. The Maintenance Storage Facility (MSF) would either be located in the City of Montebello (MSF Site 1 or 2) or in the City of Commerce (MSF Site 3).
Download CSV New Search

 

8 documents in project

Type Lead/Public Agency Received Title
Los Angeles County Metropolitan Transportation Authority (LSCMTA) Eastside Transit Corridor Phase 2 Project EA
Los Angeles County Metropolitan Transportation Authority (LSCMTA) Eastside Transit Corridor Phase 2—Atlantic to Greenwood (a component of the Eastside Transit Corridor Phase 2 project)
Los Angeles County Metropolitan Transportation Authority (LSCMTA) Eastside Transit Corridor Phase 2 Project Notice of Determination
Los Angeles County Metropolitan Transportation Authority (LSCMTA) Eastside Transit Corridor Phase 2 Project Final EIR
Los Angeles County Metropolitan Transportation Authority (LSCMTA) Eastside Transit Corridor Phase 2 Project
Los Angeles County Metropolitan Transportation Authority (LSCMTA) Eastside Transit Corridor Phase 2 Project
Metropolitan Transportation Authority Eastside Transit Corridor Phase 2 Project
Metropolitan Transportation Authority Eastside Transit Corridor Phase 2 Project