SCH Number 2026010706


Project Info

Title
Grandview Gardens and East Plano Water Consolidation Project
Description
The project proposes to correct two failing water systems by installing water delivery infrastructure and connecting 97 existing homes to the City of Porterville's community water system. The project encompasses two physically separate areas: East Plano and Grandview Gardens. The East Plano component would begin at the existing City of Porterville 8” water main in E. Worth Avenue, installing approximately 600 feet of 8-inch PVC water main and 80 feet of 4-inch PVC water main in Paul Street heading south. It would include 14 1-inch water services, meters, and meter boxes, fire hydrants, and an appurtenant tie-in assembly plus elbows, tees, and valves. It would cut, cap, and abandon in place the existing water main (size unknown) in Paul Street and demolish the existing well station at the southern end of Paul Street. All existing water meters and meter boxes would be removed. Grandview Gardens currently has a temporary City water connection feeding the system. The Grandview Gardens component the project would install a total of approximately 3,320 feet of 8-inch PVC in S. Matson Avenue, N. Prospect Street, and W. Meril Avenue, W. Baker Street, and N. Westside Street and 25 feet of 6-inch PVC water main in N. Prospect Street. Tie-ins would be made to the existing 12-inch water main in W. North Grand Avenue and the existing 10-inch water main in W. Meril Avenue. The project would install 83 1-inch water services with meters and meter boxes. Of those, 19 would connect to the existing 10-inch water mains in W. Meril Avenue and N. Douglass Street. The remainder would connect to the new 8-inch and 6-inch water mains: 28 in N. Matson Street, 28 in N. Prospect Street, 3 in W. Baker Street, 2 in N. Westside Street, and 1 in W. Meril Avenue. The project also includes hydrants and appurtenant tie-in assemblies, elbows, tees, and valves. Existing 4-inch water mains throughout the project area would be cut, capped, and abandoned in place and the existing well station on the west side of S. Matson Street approximately 220 feet north of W. Grand Avenue would be demolished. Existing blow-offs throughout the project area would be removed.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
State Water Resources Control Board, Divison of Financial Assistance Grandview Gardens and East Plano Consolidation Project
City of Porterville Grandview Gardens and East Plano Water Consolidation Project