Santa Monica College 2024 Main Campus Master Plan Update
2 Documents in Project
Summary
SCH Number
2025010279
Lead Agency
Santa Monica Community College District
Document Title
Santa Monica College 2024 Main Campus Master Plan Update
Document Type
EIR - Draft EIR
Received
Present Land Use
PL -Institutional/Public Land
Document Description
The Project consists of the adoption and implementation of the Santa Monica College (SMC) 2024 Main Campus Master Plan Update (“Proposed Project”) by the SMCCD Board of Trustees. The 2024 Main Campus Master Plan Update is an update to the Career and Educational Facilities 2010 Master Plan (last amended in June 2020) and outlines a renewed framework for the college’s future growth and development amidst changes in educational modalities, new opportunities, and optimized use of financial resources for SMC’s Main Campus. It is intended to be a living document that provides for the long-range planning framework for SMC’s Main Campus and flexibility to accommodate changes in future conditions.
The 2024 Main Campus Master Plan Update would include the demolition of existing temporary and permanent buildings, totaling approximately 360,100 gross square feet (gsf) of building area, and the construction of new replacement buildings consisting of 265,216 gsf of new floor area including the Pico 1 Business Replacement Building (76,474 gsf), the Pico 2 Drescher Hall Replacement Building (99,742 gsf), a new police headquarters building (12,000 gsf), a new student union building (42,000 gsf), a new maintenance and operations (M&O) building (26,000 gsf), and replacement structure(s) for the Pearl Street buildings (9,000 gsf) (“Project”). The Proposed Project would also include approximately 207,073 gsf of building renovations to two existing buildings (the Physical and Life Science Complex and the Library and Media Center). The Proposed Project would create various new and enhanced open spaces throughout the campus, including landscaping the proposed new Student Union building, a Welcome Lawn, an outdoor amphitheater, a Science Quad, the Tri (triangular open space area), and New Quad. The Proposed Project would generally retain the current vehicular circulation and access points and existing parking supply. The Proposed Project would be constructed in three phases beginning in 2025 with final buildout anticipated to be completed by 2035. More detailed descriptions of the Project’s architectural design, open space, landscaping, access/circulation, sustainability features, and construction schedule are provided in Section II, Project Description, of this Draft EIR.
Contact Information
Name
Charlle Yen
Agency Name
Santa Monica Community College District
Job Title
Dir. of Facilities Planning
Contact Types
Lead/Public Agency / Project Applicant
Phone
Email
Name
Shane Parker
Agency Name
Parker Environmental Consultants
Job Title
Principal
Contact Types
Consulting Firm
Phone
Location
Coordinates
Cities
Santa Monica
Counties
Los Angeles
Regions
Citywide, Countywide
Cross Streets
Pico Boulevard and 16th Street
Zip
90405
Total Acres
43.98
Parcel #
4273-001-908 and others (see Other Location Info below)
State Highways
St. Rte 1 (PCH), St. Rte 2 (SMB)
Railways
None
Airports
Santa Monica Airport
Schools
SMMUSD
Waterways
None
Township
2S
Range
15W
Section
00
Other Location Info
4284-034-905
4284-034-901
4284-034-902
4284-034-900
4284-034-904
4284-034-903
4273-022-901
4273-022-900
4273-022-902
4273-022-903
4273-022-905
4273-022-904
4273-021-901
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Education, California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 7 (DOT), California Department of Transportation, Division of Aeronautics (DOT), California Department of Transportation, Division of Transportation Planning (DOT), California Department of Water Resources (DWR), California Energy Commission, California Fish and Game Commission (CDFGC), California Governor's Office of Emergency Services (OES), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Regional Water Quality Control Board, Los Angeles Region 4 (RWQCB), California Santa Monica Mountains Conservancy (SMMC), California State Coastal Conservancy (SCC), Colorado River Board, Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Drinking Water, District 15, State Water Resources Control Board, Division of Drinking Water, District 16, State Water Resources Control Board, Division of Drinking Water, District 22, State Water Resources Control Board, Division of Drinking Water, District 7, State Water Resources Control Board, Division of Water Quality, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance
Development Types
Educational (265,216)
Local Actions
Master Plan
Project Issues
Aesthetics, Air Quality, Cumulative Effects, Energy, Greenhouse Gas Emissions, Land Use/Planning, Noise, Archeological / Historical
Public Review Period Start
Public Review Period End
Attachments
Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.