SCH Number 2025081340
Project Info
- Title
- B2 Reservoir Project
- Description
- The proposed project involves construction of a new 2.16-million-gallon potable water reservoir (B2) adjacent to the existing B1 reservoir to meet current and future demands of the Ord Community as identified in MCWD’s 2020 Master Plan. The project also includes associated site and infrastructure improvements. The B2 reservoir would connect to the existing B1 transmission main through approximately 270 feet of 20-inch pipeline. Site improvements include a paved access road and driveway connection to Colonel Durham Street, a 90-foot retaining wall, a percolation basin, 8-foot perimeter fencing, and a 12-foot swing gate. At the B1 reservoir yard, improvements include relocating the booster pump station, upgrading electrical panels, adding an emergency generator, replacing inlet/outlet valves, and removing fencing between the yards to create one contiguous facility. Activities are expected to begin in 2025 and last 18 months, with weekday work hours.