SCH Number 2025070212


Project Info

Title
Sunrise Boulevard H-frame Pole Replacement Project
Description
To enhance the safety and reliability of electric service in Sacramento County, SMUD proposes to replace two existing H-frame transmission poles along Sunrise Boulevard with new single steel poles at each location. One pole is located on the north side of the American River along Sunrise Boulevard, and the other is on the south side of the river, adjacent to the American River Bike Trail. The new steel poles will be installed in the same locations as the existing structures and will support the existing 69kV transmission line, along with a 12kV underbuild and a SMUD fiber optic conductor. Each replacement pole will be approximately 82 feet tall and set on a 9-foot diameter, 32-foot deep cast-in-drilled-hole (CIDH) concrete foundation. A minimum 42-inch layer of crushed rock will be placed around the base of each pole for erosion control and structural stability. Pole excavation will use a truck-mounted auger, with soil temporarily stockpiled adjacent to each hole. Excavated soil will either be used to backfill the old holes or removed from the site and disposed of. Each new pole will be framed with all necessary electrical hardware, including cross arms, pins, insulators, grounding components, and safety markers prior to setting the pole in the ground. After installation, the holes will be backfilled with compacted rock and the surface will be restored back to natural grade. SMUD will access poles using existing roads. Construction is expected to occur between July and October of 2025 or May and October of 2026, and would begin once all necessary permits, license, and approvals have been obtained. Construction would take approximately 4 weeks and would be performed under dry conditions.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Sacramento Municipal Utility District Issuance of General Lease – Public Agency Use – A4864
Sacramento Municipal Utility District Sunrise Boulevard H-frame Pole Replacement Project