SCH Number 2025041161


Project Info

Title
3600 Peck Road
Description
The proposed project involves the redevelopment of three of the six existing commercial buildings on the project site. The redevelopment would involve demolition of the existing vacant Denny’s (6,000 sf), Big 5 Sporting Goods (7,800 sf), and vacant China Buffet (11,047 sf); and construction of Starbucks (2,400 sf), In-N-Out (3,886 sf), and Raising Cane’s (3,612 sf) coffee/fast-food restaurants that would each provide a drive-thru facility. The project would reduce the total size of the commercial center from 52,268 sf to 37,319 sf. Each of the proposed restaurant buildings would include a drive-thru, paved parking spaces, and landscaping. The proposed Starbucks building would include outdoor seating and bike racks, 19 parking stalls, and a trash enclosure. The proposed In-N-Out building would include two outdoor seating areas, bike racks and lockers, 62 parking stalls, and a trash enclosure. The proposed Raising Cane’s building would include two outdoor seating areas, bike racks and lockers, 37 parking stalls, and a trash enclosure. Construction activities for the proposed project is estimated to start in August 2025 and end in May 2027. Construction activities for the project would include demolition, site preparation, grading, building construction, paving, and architectural coating. Because the proposed project consists of a redevelopment, it would involve 4,565 cubic yards (cy) of cut soil from building foundation demolition and removal and 293 cy of imported soil. Construction work would occur Monday through Friday from approximately 7:30 a.m. to 3:30 p.m. Weekend construction is not anticipated. Construction equipment would be staged on site, and construction workers would also park on site.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of El Monte 3600 Peck Road
City of El Monte 3600 Peck Road