SCH Number 2025040269
Project Info
- Title
- Deferred Maintenance Program DSID 20257 Pipe Removal Project
- Description
- The purpose of this project is to properly remove an abandoned 24-inch steel levee pipe penetration to limit the potential risk of levee damage/failure during a high water event. The project would require the excavation of the levee section at the project site, and reconstruction of the levee after pipe removal to its original engineering specifications.
2 documents in project