SCH Number 2025030468


Project Info

Title
Lockhart Solar (PROJ-2022-00066)
Description
Juniper Energy LLC (the Applicant) is requesting approval of a Conditional Use Permit (CUP) to construct and operate two 4-Megawat solar photovoltaic (PV) power generating facilities with long-duration battery storage capabilities for a combined 8-Megawats in total on approximately 75 acres located northwest of the unincorporated community of Hinkley (the Project). The Project would generate electricity using solar PV modules mounted on single-axis trackers and arranged in north-south arrays across the Project Site. The system would store electrical production in long-duration batteries, which require no cooling system and have no risk of fires. Switchgear, a weather station, inverters, and transformers would manage the system and convert power for distribution to the nearby transmission grid. Electrical conduit, transmission and collection lines would be installed both overhead and underground. The solar PV facilities would interconnect to the 33kV distribution line owned and operated by Southern California Edison (SCE). One system would interconnect at a point near the southwestern border of the Project Site. The second system would interconnect along the northern boundary through a new electric line installed along the access easement at a point located at the corner of Roy Road and Harper Lake Road.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
San Bernardino County Lockhart Solar (PROJ-2022-00066)
San Bernardino County Lockhart Solar (PROJ-2022-00066)