SCH Number 2024120012
Project Info
- Title
- Landfill Gas to Energy Plant Project
- Description
- Biofuels Coyote Canyon Biogas (project applicant) proposes to develop the 4.14-acre project site with a new renewable natural gas (RNG) processing plant and a pipeline interconnection facility (collectively referred to as the RNG facility). The proposed RNG facility would have a total building footprint of 38,500 square feet (0.88 acres) composed of pipe racks, various vessels, a condensate tank, flare, thermal oxidizer, and other processing equipment. The first stage of primary treatment is covered by the existing landfill flaring facility on the project site operated by Orange County Waste and Recycling. Landfill gas (LFG) from the existing flare yard would be conveyed to the proposed RNG facility through a proposed underground LFG supply line for secondary and advanced treatment. The treated LFG would then be injected into SoCalGas infrastructure in the western part of the site via the proposed 6,000-square-foot pipeline interconnection facility. The interconnection facility would include a point of receipt (POR) skid to monitor the quality of the RNG and an 8-inch pipeline extension dedicated to transfer the RNG from the POR to the existing fossil natural gas pipeline tie-in point. Other project components include vehicular access, installation of a fire hydrant, a water tank on site, a septic tank for the proposed control room, and new underground power and telecommunication lines.
2 documents in project