SCH Number 2024081292
Project Info
- Title
- South Tahoe Greenway - Upper Truckee River Bridge at Johnson Meadow
- Description
- The Project would build upon the overall shared-use path network on the south shore of Lake Tahoe by constructing approximately 1.2 miles of Class 1 shared-use path and replacing a heavily trafficked bridge over the Upper Truckee River damaged by the 2017 winter storms. The Project would construct approximately 5,075 linear feet of asphalt path in forested upland, approximately 935 linear feet of elevated boardwalk through Johnson Meadow, and replace the damaged bridge in the Upper Truckee River with a 140-foot bridge on a new alignment that entirely spans the river.
2 documents in project