SCH Number 2022070445
Project Info
- Title
- Lake Skinner Regional Water Transmission System (formerly EM-11)
- Description
- Eastern Municipal Water District (District) intends to prepare an Environmental Impact Report (EIR) for the proposed Lake Skinner Regional Water Transmission System Project (Project), which was formerly called the EM-11 Transmission Pipeline and Pump Station Project. A Notice of Preparation (NOP) was previously circulated for the EM-11 Transmission Pipeline and Pump Station Project in July 2022. The current Project includes similar components and objectives as the previous version; however, the locations of the Project components have changed and therefore, this NOP is being recirculated.
3 documents in project
| Type | Lead/Public Agency | Received | Title |
|---|---|---|---|
| EIR | Eastern Municipal Water District (EMWD) | Lake Skinner Regional Water Transmission System Project | |
| NOP | Eastern Municipal Water District (EMWD) | Lake Skinner Regional Water Transmission System (formerly EM-11) | |
| NOP | Eastern Municipal Water District (EMWD) | EM-11 Transmission Pipeline and Pump Station Project |
