SCH Number 2019079027
Project Info
- Title
- Carbon Capture and Mineralization Project
- Description
- Note: Review Per Lead The proposed project, consists of a carbon capture and mineralization pilot facility that would operate for a 12-month period. The facility would remove carbon dioxide (CO2) from a slipstream of flue gas from Calpine's Los Medanos Energy Center or an outlet stream of gas from the gas-fired steam boiler and combine the removed CO2 with locally sourced demolished/returned concrete to produce new "CO2 sequestered" and "upcycled" rock products. These products would be sold to Bay Area businesses, governments and consumers for use in a wide range of low carbon and high-performance concrete applications. The project site has been previously disturbed and permanently capped. Construction of the project would consist of skid-mounted equipment with no below grade construction activities of facilities or pipelines.
4 documents in project
| Type | Lead/Public Agency | Received | Title |
|---|---|---|---|
| NOE | City of Pittsburg | SFBA Carbon Capture & Mineralization Pilot Project, AP-19-1412EXT. (UP) | |
| NOD | City of Pittsburg | SFBA Carbon Capture & Mineralization Pilot Project; AP-22-0097 (AP-21-1590 & AP-19-1412(UP)) | |
| NOD | City of Pittsburg | Carbon Capture and Mineralization Project | |
| MND | City of Pittsburg | Carbon Capture and Mineralization Project |
