SCH Number 2016052031


Project Info

Title
Supplemental Initial Study and Mitigated Negative Declaration - City of Brentwood - Wastewater Treatment Plant Phase II Expansion Project
Description
As originally proposed, the Project involved construction of a biosolids dryer building and storage silo as a means of producing Class A biosolids, thus facilitating additional uses or disposal methods for the biosolids. The City has since decided to use different technology and place the biosolids drying facilities at a different location. The project modifications consist of the following main components. 1. Installation of a biosolids drying and pyrolysis system (BDPS) outside of the existing footprint of the WWTP. 2. Realignment of a paved connector path to the Marsh Creek trail. 3. Installation of new WWTP perimeter fencing around the BDPS. 4. Tree removal. All project components would be constructed on 4 acres of City-owned property immediately adjacent to the east boundary of the current WWTP footprint.
Download CSV New Search

 

7 documents in project

Type Lead/Public Agency Received Title
City of Brentwood City of Brentwood Wastewater Treatment Plant Phase II Expansion Project
City of Brentwood City of Brentwood Wastewater Treatment Plant Phase II Expansion Project
City of Brentwood Wastewater Treatment Plant Phase II Expansion Project
City of Brentwood Supplemental Initial Study and Mitigated Negative Declaration - City of Brentwood - Wastewater Treatment Plant Phase II Expansion Project
City of Brentwood Wastewater Treatment Plant Phase 2 Expansion Project (Project); Clean Water State Revolving Fund (CWSRF) NO. C-06-8095-110
City of Brentwood City of Brentwood - Wastewater Treatment Plant Phase II Expansion Project
City of Brentwood City of Brentwood - Wastewater Treatment Plant Phase II Expansion Project