DMP Drainage Pipe Replacement Project
2 Documents in Project
Summary
SCH Number
2026061104
Lead Agency
Reclamation District 1600
Document Title
DMP Drainage Pipe Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
9/15/2026
Document Description
Reclamation District No. 1600 (RD 1600) proposes the Deferred Maintenance Program (DMP) Drainage Pipe Replacement Project (Proposed Project). The Proposed Project involves replacing a single 48-inch drainage pipe that passes through the levee and conveys water from agricultural lands east of Woodland, California, to the Tule Canal within the Yolo Bypass. The replacement will be completed in kind, maintaining the existing pipe size, function, and alignment.
Contact Information
Name
Mike Kynett
Agency Name
MBK Engineers
Job Title
Principal Engineer
Contact Types
Project Applicant
Phone
Name
Michele Clark
Agency Name
Reclamation District 1600
Job Title
District President
Contact Types
Lead/Public Agency
Address
Phone
Location
Coordinates
Cities
Woodland
Counties
Yolo
Regions
Northern California
Zip
95691
Total Acres
0.406
Parcel #
057110007000
Waterways
Tule Canal, Sacramento River
Township
10N
Range
3E
Other Location Info
The proposed Project would be located Southeast of the town of Knights Landing, along the Tule Canal in Yolo County, California at Levee Mile 0.36, District Station 19+20, approximately 2.36 miles south of the Fremont Weir and 3.87 miles north of County Road 22.
Notice of Determination
Approving Agency
Reclamation District No. 1600
Approving Agency Role
Lead Agency
Approved On
County Clerk
Yolo
Final Environmental Document Available at
MBK Engineers, 455 University Avenue, Suite 100, Sacramento, CA 95825
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
