Bear Pen Timber Harvesting Plan 2-20-00011-BUT (Streambed Alteration Agreement EPIMS Notification No. BUT-66830-R2)
Summary
SCH Number
2026051203
Lead Agency
California Department of Forestry and Fire Protection
(CAL FIRE)
Document Title
Bear Pen Timber Harvesting Plan 2-20-00011-BUT (Streambed Alteration Agreement EPIMS Notification No. BUT-66830-R2)
Document Type
NOD - Notice of Determination
Received
Posted
5/29/2026
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement EPIMS Notification Number BUT-66830-R2, pursuant to section 1611 of the Fish and Game Code to the project Applicant, The CHY Company. The projects are limited to the replacement of an undersized corrugated metal pipe (CMP), the removal of a CMP, installation of a dipped crossing, and stabilization efforts on a vented ford.
Contact Information
Name
Daviel Vazquez
Agency Name
Department of Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Phone
Name
Redding Review Team
Agency Name
Department of Forestry and Fire Protection
Job Title
Review Team Chair
Contact Types
Lead/Public Agency
Phone
Location
Counties
Butte
Regions
Northern California
Other Location Info
The projects are located within the boundaries of a timber harvesting plan in Butte County, within CALWATER watersheds Oroleve Creek, Lewis Flat, and their connecting tributaries; Section 33, Township 20N, Range 7E, U.S. Geological Survey (USGS) map Clipper Mills; Mount Diablo Base and Meridian.
Notice of Determination
Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Timber Harvesting Plan)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
