Knauf Culvert Replacement Project

2 Documents in Project

Summary

SCH Number
2025041299
Lead Agency
City of Shasta Lake
Document Title
Knauf Culvert Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
6/19/2025
Document Description
The project will remove an at-risk water conveyance system beneath a private rail spur and reinforce the project site to prevent further loss. The intent of the project is to eliminate a failing culvert system and provide a stable crossing that accommodates updated floodplain values. The project will serve the operational needs of the industrial plant while achieving restoration goals for the natural environment. Construction activities include excavation of ballast material, removal of a CMP culvert and temporary arch culvert replair, installation of a pre-cast box culvert, wingwalls, rock access pad and temporary access road. De-watering activities within Newtown reek will be accomplished via placement of a temporary dam for water conveyance. All equipment and materials will be promptly removed and any areas where vegetation disturbance occurred will be re-vegetated. All construction and demolition debris removed during construction (including excavated ballast material) will be hauled offsite and disposed of at a licensed landfill. Coordination with California Department of Fish and Wildlife, the Central Valley Regional Water Quality Control Board and the U.S Army Corps of Engineers is anticipated to obtain applicable permits and approval prior to implementation.

Contact Information

Name
Peter Bird
Agency Name
City of Shasta Lake
Job Title
Senior Planner
Contact Types
Lead/Public Agency

Name
Knauf Insulation
Agency Name
Randy Turner
Job Title
Manager, Plant Engineering
Contact Types
Project Applicant

Name
Vestra Resources
Agency Name
Mary Johnson
Job Title
Environmental
Contact Types
Project Applicant

Location

Cities
Shasta Lake
Counties
Shasta
Regions
Citywide
Cross Streets
Ashby Road and UPRR
Zip
96016
Total Acres
.8
Parcel #
064-150-077
State Highways
NA
Railways
Union Pacific
Airports
None
Schools
NA
Waterways
Newtown Creek, Churn Creek-Sacramento Watershed
Township
32N
Range
5W
Section
1
Base
MDM

Notice of Determination

Approving Agency
City of Shasta Lake
Approving Agency Role
Lead Agency
Approved On
County Clerk
Shasta
Final Environmental Document Available at
www.cityofshastalake.gov

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.