Gilroy Data Center

3 Documents in Project

Summary

SCH Number
2022110127
Lead Agency
City of Gilroy
Document Title
Gilroy Data Center
Document Type
NOD - Notice of Determination
Received
Posted
8/20/2025
Document Description
Architectural and Site Review permit for the construction of a data center campus at a 56-acre undeveloped parcel located at the southeast end of Arroyo Circle. The project will be constructed in two phases supporting two data center buildings and a security building totaling approximately 438,500 square feet. Other improvements include a substation/switchyard, offsite transmission upgrades to the existing Pacific Gas and Electric transmission and distribution system, a potential future Battery Energy Storage System (Phase I BESS) or a similar alternative back-up power system capable of up to 50-megawatts (MW), and other utility interconnections. The Phase I, Building 1 data center building is approximately 218,000 square feet, requires a 49 MW connection to Pacific Gas & Electric (PG&E) service and would be supported by twenty-five 2.5 MW emergency generators to power the servers in the event of an emergency, and one 600- kilowatt (kW) generator to power other essential building functions such as lighting, in case of a power outage.

Contact Information

Name
Gloria Sciara
Agency Name
City of Gilroy
Job Title
Senior Planner
Contact Types
Lead/Public Agency

Name
Anusha Andukuri
Agency Name
Amazon Web Services
Job Title
Senior Environmental Program Manager
Contact Types
Project Applicant

Location

Counties
Santa Clara
Regions
Citywide
Cross Streets
Camino Arroyo, north of East 6th Street before it becomes Gilman Road, and east of Arroyo Circle
Zip
95020
Total Acres
56
Parcel #
841-69-044
State Highways
101
Railways
Southern Pacific
Schools
South Valley Middle School, Gilroy Prep, Elliot Elementary
Waterways
Llagas Creek
Township
10S
Range
4E
Section
00

Notice of Determination

Approving Agency
City of Gilroy
Approving Agency Role
Lead Agency
Approved On
County Clerk
Santa Clara
Final Environmental Document Available at
https://www.cityofgilroy.org/1019/Amazon-Data-Center

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.