Livingston 1, 2, 3 – Trichloropropane Removal Treatment System Project
6 Documents in Project
Summary
SCH Number
2018091025
Lead Agency
City of Livingston
Document Title
Livingston 1, 2, 3 – Trichloropropane Removal Treatment System Project
Document Type
NOD - Notice of Determination
Received
Posted
5/29/2026
Document Description
The State Water Resources Control Board (State Water Board) is a Responsible Agency for the Project. The State Water Board is funding the Project referred to internally as Livingston 1, 2, 3 – Trichloropropane Removal Treatment System Project. The Project includes the construction of two centralized 1,2,3-Trichloropropane (TCP) treatment plants (one at the Arakelian Park site and another at the Well No. 8 site) and approximately 6,300 feet of connecting water pipelines. At Arakelian Park, the Project includes construction of a new one million gallon (MG) storage tank, and a 6,000 gallons per minute (gpm) booster pump station. At Well No. 8 site, a 1.5 MG storage tank and a 4,500-gpm booster pump station will be constructed.
PROJECT NUMBER: 2410004-004C
Contact Information
Name
Cedric Irving
Agency Name
State Water Resources Control Board
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Phone
Name
Miguel Galvez
Agency Name
City of Livingston
Job Title
City Planner
Contact Types
Lead/Public Agency
Address
Phone
Location
Cities
Livingston
Counties
Merced
Regions
Citywide
Other Information
The Project is situated within the City of Livingston, with all pipelines and facilities to be constructed on City-owned property and within City rights-of-way in Livingston, Merced County, California.
Notice of Determination
Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Merced
Final Environmental Document Available at
1001 I Street, 16th Floor, Sacramento, CA 95814
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.