Big Shift Project #2/c and Long Range Development Plan Amendment No. 3

44 Documents in Project

Summary

SCH Number
2017012008
Lead Agency
University of California
Document Title
Big Shift Project #2/c and Long Range Development Plan Amendment No. 3
Document Type
NOD - Notice of Determination
Received
Posted
3/19/2026
Document Description
The proposed project is the Big Shift Project #2/c and Long Range Development Plan (LRDP) Amendment No. 3 which includes the demolition of wastewater treatment plant facilities and construction of the proposed hot-water Thermal Energy Storage (TES) plant. The new TES plant would be constructed immediately south of the existing chiller plant on Putah Creek Lodge Road. The project delivers two new Heat Recovery Chillers (HRC), associated pumps, and required electrical infrastructure. The TES tank would be approximately 100 feet in diameter and approximately 60 feet tall. Other site improvements include new lighting, concrete paving and asphalt, fencing, landscaping, and stormwater drainage connections. The project also includes a minor LRDP Amendment #3 to the 2018 LRDP to redesignate the land use of 0.71 acres, from Academic and Administrative to Campus Utilities.

Contact Information

Name
Brian Harrington
Agency Name
University of California
Job Title
Director of Physical and Environmental Planning
Contact Types
Lead/Public Agency

Location

Cities
Davis
Counties
Yolo
Regions
Northern California
Other Location Info
University of California, Davis Campus

Notice of Determination

Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (An Addendum to the 2018 LRDP EIR (Hot Water Phase 2 Conversion Project, September 2023))
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.