San Joaquin River Basin, Lower San Joaquin River, CA Project Compensatory Mitigation Plan
11 Documents in Project
Summary
SCH Number
2010012027
Lead Agency
San Joaquin County Area Flood Control Agency
Document Title
San Joaquin River Basin, Lower San Joaquin River, CA Project Compensatory Mitigation Plan
Document Type
NOD - Notice of Determination
Received
Posted
5/26/2026
Document Description
This combined supplemental environmental assessment/supplemental environmental impact report (SEA/SEIR) evaluates the environmental effects of implementing habitat mitigation through different methods than was identified in the 2018 San Joaquin River Basin, Lower San Joaquin River, CA, Final Integrated Interim Feasibility Report/Environmental Impact Statement/Environmental Impact Report (2018 LSJR IIFR/EIS/EIR). An updated project mitigation strategy proposes to establish up to six onsite and offsite habitat mitigation sites instead of purchase of mitigation bank credits due to their lack of availability in the project area.
Contact Information
Name
Omar Al-Hindi
Agency Name
San Joaquin Area Flood Control Agency
Job Title
Executive Project Manager
Contact Types
Lead/Public Agency
Phone
Email
Location
Coordinates
Cities
Stockton, unincorporated areas
Counties
San Joaquin
Regions
Countywide, Northern California
Cross Streets
Multiple
Total Acres
Approx. 560
Parcel #
071-070-01; 129-290-01; 102-010-04, -05, and -06; 158-003-008
Waterways
San Joaquin River, Calaveras River
Other Location Info
Additional coordinates: 38 0 9.0, 121 27 13.0; 37 59 4.0, 121 18 34.0; 37 59 17.0, 121 18 24.0; 37 59 30.0, 121 17 60.0; 38 2 57.0, 121 42 3.0
Notice of Determination
Approving Agency
San Joaquin Area Flood Control Agency
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Joaquin
Final Environmental Document Available at
2800 West March Lane, Suite 200, Stockton, CA 95219
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Final Document(s) [Approved_Certified draft environmental documents]
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
