SCH Number 2026080680
Project Info
- Title
- Temporary Hydrokinetic Turbine Performance Testing
- Description
- The project consists of the temporary deployment and performance testing of Emrgy Twin EM3.1 hydrokinetic turbines within an existing concrete lined Arvin-Edison Water Storage District canal to evaluate renewable energy generation and operational performance. The pilot project involves no permanent construction or structural Wong is fully removable and win provide information to support future energy and operational planning for the District.
1 documents in project
| Type | Lead/Public Agency | Received | Title |
|---|---|---|---|
| NOE | Arvin-Edison Water Storage District | Temporary Hydrokinetic Turbine Performance Testing |
