- Atascadero Creek Lake Fill Pipeline Repair Project
- Description
- The City of Atascadero owns a pipeline that carries water from Atascadero Creek to Atascadero Lake during high-flow events. Approximately 350 linear feet of that pipeline (beginning at the inlet) have degraded, become impacted with sediment, and require repair for the pipeline to function. The project involves a pipeline replacement and repair of the approximately 350-foot segment of the degraded pipeline and associated concrete hold-downs, and maintenance of existing intake structures and diversion boxes. The replacement pipeline will be of equivalent capacity in the same alignment as the existing pipe to restore functionality to the pipeline. The project will require approximately 96 cubic yards of excavation to remove the existing pipe and removal of riparian vegetation adjacent to and above the existing pipeline.