SCH Number 2026050043


Project Info

Title
Butte Street Boogie Network Project
Description
The City of Redding proposes to construct an Active Transportation Project. The purpose of the project is to safely accommodate active transportation, including people that walk, bike and roll. It is needed because the roadway and trail segments included in the project have discontinuous pedestrian and bicycle facilities, and for some sections, no facilities. Pedestrians and bicyclists are required to share roadways with motor vehicles, take circuitous detours, or use unimproved (dirt surface) paths. The project includes: three new 36-foot diameter traffic circles, new and upgraded ADA curb ramps, curbs, gutters, sidewalks, retaining walls, lighting, multi-use pathways, and a pedestrian bridge. Construction work will consist of earthwork, trenching, vegetation removal, utility relocation, drainage installation and modification, tree planting, installation of irrigation, paving, striping, and sign replacement/installation. Utilities will be relocated as needed to implement the ADA compliant improvements. Drainage improvements include the installation, modification, removal, or replacement of the City storm drain utility infrastructure to ensure positive drainage of the non-motorized improvements. The improvements will be constructed the City right of way and within easement areas. Construction is anticipated to begin in 2027 and continue through 2028.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of Redding Butte Street Boogie Network Project
City of Redding Butte Street Boogie Network Project