SCH Number 2026041305


Project Info

Title
Tule River Tribe Complete Streets and Two Pedestrian Bridges
Description
The Project predominantly includes the construction of two new pedestrian bridge crossings. Generally, the Project would provide safer routes for Tule River Tribe pedestrians to cross the South Fork of the Tule River (Tule River) to access an education center and gymnasium and provide safe river crossings via pedestrian bridges. The Project is exclusively located along the South Fork of the Tule River exclusively within the Tule River Reservation, which is located approximately 20 miles southeast of the City of Porterville. Project components include: 1. Replacement of the existing pedestrian swinging bridge. 2. A new pedestrian bridge to connect Cow Mountain Road and the corridor to the Justice Center. 3. Class 1 trail. 4. Approximately 3,765 SF of concrete sidewalk. 5. Seven (7) accessible curb ramps. 6. Two (2) streetlights for the N. Reservation Road corridor. 7. Eight (8) new solar-powered Rectangular Rapid Flashing Beacons (RRFBs) (4 locations. 8. 2 RRFBs assumed per location). 9. Two (2) raised pedestrian crossings. 10. Reconfiguration of back-in-angled parking stalls. 11. Landscaping and irrigation for the length of the project. 12. Signing and pavement delineation for the corridor, including pedestrian bridge.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
City of Porterville Tule River Tribe Complete Streets and Two Pedestrian Bridges Project
City of Porterville Tule River Tribe Complete Streets and Two Pedestrian Bridges Project
Porterville Irrigation District Tule River Tribe Complete Streets and Two Pedestrian Bridges