- Red Hill Bay BACM Project
- Description
- The Project would reduce dust emissions by applying a commercially available chemical stabilization product (Soiltac®) to protect the surface from wind erosion. Stabilizer application would be via water truck or hose reel and irrigation boom. Temporary resource protection berms would be installed to protect onsite ditches and wetlands from construction of the dust control project; application of soil stabilizer would not occur within 300 feet of existing vegetated wetlands and ditches. The Project also includes graded access routes and improvement of an existing on-site access road.