SCH Number 2026020575
Project Info
- Title
- P1 Hueneme Parking Structure Project
- Description
- The Oxnard Harbor District proposes to construct and operate a new approximately 455,900-square-foot, up-to-six-level aboveground vehicle parking structure at the Port of Hueneme (Port), just west of the Port office building located at 333 Ponoma Street, Port Hueneme. The parking structure would serve as the transfer point for automobiles unloaded from between ocean-going vessels, with vehicles subsequently driven to designated regional off-site processing centers for processing and distribution. An approximately 345,800-square-foot concrete parking pad would also be poured outside the parking structure for high-and-heavy cargo/vehicles, which may include oversized cargo, vehicles, or specialized equipment. This concrete pad would be designed to support existing operational requirements, including vehicle maneuvering, staging, and access. With project implementation, annual automobile imports could increase to approximately 700,000 vehicles by the year 2046.
2 documents in project