SCH Number 2026010720
Project Info
- Title
- Increase in Processing and Transfer of Construction, Demolition and Inert Materials, California Waste Services-Downtown Los Angeles
- Description
- California Waste Services, LLC is permitted for a maximum throughput of 500 tons per day (tpd) and is proposing to increase throughput to a maximum of 900 tpd. In order to assist with the proposed increase in CDI, a wood grinding system consisting of an electric Rotochopper grinder and associated conveyors capable of processing 30 to 40 tons of recycled wood per hour would be installed within the plant. An additional project feature is a storm water vault that would be constructed in the eastern portion of the property. Once constructed, storm water will be diverted to the vault which will be designed with a base mat and dry wells for filtration/infiltration to minimize off-site storm water discharges.
3 documents in project
| Type | Lead/Public Agency | Received | Title |
|---|---|---|---|
| FIN | City of Los Angeles | Increase in Processing and Transfer of Construction, Demolition and Inert Materials, CWS-DTLA | |
| NOD | City of Los Angeles | Increase in Processing and Transfer of Construction, Demolition and Inert Materials, CWS-DTLA | |
| MND | City of Los Angeles | Increase in Processing and Transfer of Construction, Demolition and Inert Materials, California Waste Services-Downtown Los Angeles |
