SCH Number 2025120227
Project Info
- Title
- Tahoe Keys Well #4 Site Improvements and Waterline Upgrade Project
- Description
- The proposed Project proposes to install 6,520 linear feet of 12-inch waterline in place of existing waterlines, which would connect to a new 2,000-gallon-perminute (gpm) production well (Well 4). The production well is located on a parcel (well site) on Ala Wai Boulevard owned by Tahoe Keys Property Owners Association (TKPOA), currently used as a tennis court facility and park. The Project would construct at the well site a 1,600 square foot (32’ by 50’) well building equipped with a well pump, associated piping, a standby generator, and electrical, instrumentation, and chlorination equipment. In addition, a separate 9’ by 14’ foot building would be constructed to accommodate a single-stall restroom. The existing park at the well site will be used as a staging area for the new Well 4 site improvements, and portions of the site may be used for the waterline upgrades. Another potential staging area for the waterline upgrade is the TKPOA corporation yard located on the south side of Lake Tallac next to the water treatment building. The new waterlines are anticipated to be located within existing public utility easements and roadways under or adjacent to White Sands Drive, Ala Wai Blvd, Tahoe Keys Blvd, and Venice Drive. The system would be maintained by TKWC and would be similar to the current levels and types of operations and maintenance (O&M) activities.
2 documents in project