SCH Number 2025110233


Project Info

Title
Vic Trace Reservoir Replacement Project
Description
The proposed Project would replace aging water infrastructure and implement improvements to enhance the reliability, resiliency, and operational flexibility of the City’s water system. The Project would involve demolition of the existing 10-million-gallon Vic Trace Reservoir and construction of two new 5-million-gallon reservoirs at the same site. The new reservoirs would be fully buried below finished grade with soil cover. Additional onsite improvements include replacement of the existing Valve Building with a new facility housing pumps, disinfection systems, and electrical equipment; reabandonment of an existing oil well in accordance with current regulatory standards; construction of new access roads, landscaping, and site infrastructure; and potential installation of renewable energy generation and storage systems. Offsite improvements include installation, replacement, and relocation of underground water pipelines within surrounding streets; construction of a new underground pressure reducing valve (PRV) station and abandonment of the existing PRV station; and temporary use of a City-owned residential property for construction offices. Project construction would occur over an approximately three-year period and would include demolition, grading, excavation, pipeline installation, and facility construction activities.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of Santa Barbara Vic Trace Reservoir Replacement Project
City of Santa Barbara Vic Trace Reservoir Replacement Project