SCH Number 2025101397
Project Info
- Title
- Heber 1 Parasitic Solar Energy Project
- Description
- The project applicant proposes to develop a 20 megawatt solar energy facility and interconnecting cable line (gen-tie line) that would provide parasitic load to the existing Heber 1 Geothermal Plant. The solar energy facility would provide behind-the-meter power used to offset the auxiliary load of the existing Heber 1 Geothermal Plant. The solar energy facility would not connect to or generate power that will enter the transmission grid; rather, the solar energy facility would be entirely behind-the-meter and would serve as an integrated part of the operation of the existing Heber 1 Geothermal Plant. There are three route options proposed, of which only one will be chosen, for the medium voltage cable that would connect the new 20 MW solar energy facility to the existing Heber 1 Geothermal Plant.
2 documents in project