SCH Number 2025091350
Project Info
- Title
- Higgins Fire Station
- Description
- Construction of the new facility would include a 9,296 square foot (sf), two-engine fire station including an 18-bed barracks/3 bay apparatus building, 2,048 sf administration building, and an 816-sf storage building. Site development would include earthwork, drainage, stormwater system, roads, curbs and paving, gutters and sidewalks, a 2,000-gallon above ground fuel vault, fire suppression system, site lighting, hose drying rack, fencing, trash enclosure, flagpoles, bike racks, electric vehicle chargers, ground-mounted photovoltaic system, two 1,000-gallon propane tanks, fire sprinkler system, fire hydrant, backflow preventer, post indicator valve, fire department connection, 85 kW generator, and landscaping. Utilities would include connecting to the existing water main in Combie Road for potable, irrigation, and fire water, sewer connection to the existing manhole at Combie/W Hacienda intersection, electrical power, solar, LPG/natural gas, telephone, and radio. Depth of excavation is anticipated to be up to 3 feet.
3 documents in project
| Type | Lead/Public Agency | Received | Title |
|---|---|---|---|
| FIN | California Department of Forestry and Fire Protection (CAL FIRE) | Higgins Fire Station | |
| NOD | California Department of Forestry and Fire Protection (CAL FIRE) | Higgins Fire Station | |
| MND | California Department of Forestry and Fire Protection (CAL FIRE) | Higgins Fire Station |
