SCH Number 2025090932
Project Info
- Title
- Sheffield Subdivision Project
- Description
- The proposed project would include the demolition of the existing on-site single-family residence, removal of the associated septic system, abandonment of the associated well, removal of 21 on-site trees, and subdivision of the site into 65 single-family residential lots. Subsequent to demolition and subdivision, the project would include the future development of 65 single-family residential units, an internal circulation network, continuation of South Deadman’s Gulch Trail, frontage improvements along East Stockton Boulevard, and off-site roadway improvements. The proposed project would require approval of a General Plan Amendment, NEASP Amendments, a Rezone, and a Tentative Subdivision Map.
2 documents in project
