SCH Number 2025060167
Project Info
- Title
- Poplar Basin Project
- Description
- The new approximately 41.7-acre recharge basin facility is comprised of two (2) 20-acre basins and would include two new turnout connections from the LTRID’s Casa Blanca Ditch on the southern end of the property. Each turnout would have approximately 100 feet of pipeline. The basin would generally be rectangular in shape and consist of two interconnected cells surrounded by lands in agricultural production. There are two existing turnouts that are in the canal but would not be used as part of this project as well as a check structure along the Casa Blanca Ditch running along the southern border of the Area of Potential Effect (APE). The check structure is not part of the project and would remain as is. Overhead electricity lines run along the northern border of the APE with an existing power pole near the northeast corner of the APE. The APE is identified as approximately 41.7 acres for the purposes of biological and cultural surveys.
2 documents in project
