SCH Number 2025050153


Project Info

Title
Stream Gage Installation Project
Description
Four stream gauges will be installed at different locations. Each gage will consist of two poles, approximately 2 inches in diameter, which will be driven into the ground. These two poles will support the necessafy measuring equipment. Additionally, a small line will run to the boliom of the river in a trench to measure the water. Each gage installation is expected to be completed in a one-week period during dry river conditions. Dewatering would not be necessary, no in-waterwork would be conducted in the Tule River.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
California Department of Water Resources (DWR) CalSIP Stream Gage Installation Project - Lower Tule River
Lower Tule River Irrigation District Stream Gage Installation Project