SCH Number 2025050077


Project Info

Title
Nicasio Spillway Modification Project
Description
Marin Water proposes to modify the existing spillway at Seeger Dam to gain additional storage capacity. Marin Water would install an inflatable rubber gate spanning the width of the existing spillway crest to temporarily increase storage in Nicasio Reservoir for carryover into a potential dry season. Approximately one foot of existing concrete crest structure would be demolished to provide a level surface to install the gate. A small control building would be constructed east of the spillway. The existing backup power system would be upgraded.
Download CSV New Search

 

1 documents in project

Type Lead/Public Agency Received Title
Marin Municipal Water District *Withdrawn Per Lead* Nicasio Spillway Modification Project