SCH Number 2025041408
Project Info
- Title
- Santa Ana River Trail Project, Segment 3B
- Description
- The Proposed Project involves installing a multi-use trail in SART Phase 3B which is located within the Prado Dam Flood Control Basin area of the Santa Ana River in unincorporated Riverside County, California. The Proposed Project will construct a 0.66-mile gap in the 110-mile planned alignment, connecting to or narrowing the distance from existing constructed portions of the trail upstream and downstream of Prado Basin. The Proposed Project include construction of a Class I asphalt/concrete bicycle path with decomposed granite pedestrian and equestrian path with a general design, as follows: Ten-foot bicycle path travel way with two-foot shoulders, five percent maximum slope, two percent maximum cross fall path and shoulder slopes, minimum 2 to 1 foot slope ratio for cut/fill slopes, and signage and striping along the trail. The construction phasing and activities are expected to take approximately eight months to complete for this trail phase. Construction is anticipated to be initiated and completed in 2026, though the estimated date may be subject to change.
2 documents in project