SCH Number 2025041405
Project Info
- Title
- Santa Ana River Trail Project, Segments 2, 2A, and 3A
- Description
- The Proposed Project involves installing multi-use trails in SART Phases 2, 2A, and 3A which are located within the Prado Dam Flood Control Basin area of the Santa Ana River in unincorporated Riverside County, California. The Proposed Project will construct a 2.78-mile gap in the 110-mile planned alignment, connecting to or narrowing the distance from existing constructed portions of the trail upstream and downstream of Prado Basin. The Proposed Project include construction of a Class I asphalt/concrete bicycle path with decomposed granite pedestrian and equestrian path with a general design, as follows: Eight-to-ten-foot bicycle path travel way with two-foot shoulders, five percent maximum slope, two percent maximum cross fall path and shoulder slopes, minimum 2 to 1 foot slope ratio for cut/fill slopes, signage and striping along the trail, implementation of drainage improvements, and application of native hydroseed mix along graded slope areas of the new trail phases. The construction phasing and activities are expected to take approximately 12 months to complete for each individual trail phase. Construction is anticipated to be initiated in 2025 and be completed by 2026 with construction expected to last 12 months for each trail phase, though the estimated dates may be subject to change.
2 documents in project