Industrial Water Treatment Plant Test Well Conversion and Water Treatment Plant Expansion Project
Description
This Project consists of the design for converting the 2016 IWTP test well into a production well and required upgrades to the Water Treatment Plant to allow pipeline routing, connection, and the expansion of existing plant for the new well. The test well conversion to a production well shall meet a design capacity of at least 1,000 gpm, with the design flow of the new variable speed well pump at 1,150 gpm at maximum speed.