SCH Number 2025030282
Project Info
- Title
- Wilmington Greening Infrastructure Projects
- Description
- The Wilmington Greening Infrastructure Projects include two individual but related proposed Projects. The Projects would reduce pollutant loads in stormwater that flows through the community and into the Dominguez Channel Watershed and the San Pedro Bay by capturing stormwater and runoff flows as well as helping to alleviate flooding in the surrounding area. The captured stormwater would eventually be treated at the Terminal Island Wastewater Reclamation Plant, increasing the recycled water supply in the City of Los Angeles.
2 documents in project
