SCH Number 2025020095
Project Info
- Title
- Valley County Water District Nixon Storage Expansion
- Description
- The Project would provide additional water storage capacity at the Clinton O. Nixon Treatment and Storage Facility and the VCWD service area. According to the 2021 Water Master Plan, the VCWD service area is deficient in storage by 4.84 MG and future deficiency would be 6.02 MG. The Valley County Water District proposes to develop two (2) additional water reservoirs on the existing Clinton O. Nixon Treatment and Storage Facility consisting of 2.7 acres. The existing carport, warehouse, and district offices would be demolished prior to construction of the reservoir tanks. The reservoir tanks proposed at the Project site would be up to 108 feet in diameter and up to approximately 47 feet in total height. The proposed reservoir tanks would consist of 2.5 MG each to assist in offsetting the current and forecasted storage deficiencies within the VCWD area. The reservoir tanks would be painted a solid, neutral color and would have a nonreflective surface. The water supply for the new reservoir tanks would be from the Nixon East and West Well. The Nixon Booster Station would deliver water from the proposed reservoir tanks to the existing system. The two new reservoir tanks would be located in the eastern portion of the Project site to the east of the existing reservoir tanks.
2 documents in project