SCH Number 2024120843
Project Info
- Title
- Slip-out Repair and Bank Stabilization Near 1780 Higgins Canyon Road Project
- Description
- The proposed project consists of road repairs, bank stabilization, and habitat enhancement along the southwestern bank of Mills Creek adjacent to the northeastern side of Higgins Canyon Road in San Mateo County. Approximately 110 linear feet of creek bed, 185 feet of creek bank, and 180 feet of roadway have been eroded and require repair. The objective of the Project is to repair the damaged road and restore the bed and failed bank of Mills Creek. The proposed Project involves: 1) an approximately 192-linear-foot-long soldier pile retaining wall, 2) an approximately 185-foot, biostabilization-based bank repair (soil lifts and vegetated boulder revetments),3) approximately 110 linear feet of engineered creek bed to restore the channel to its pre-erosional original flowpath, and 4) reconstruction of approximately 180 linear feet of failed roadway within the existing footprint to restore the travel lane and shoulder area. The project would remove approximately 2,116 square feet of the asphalt from the existing compromised roadway on the northeastern edge of the road where it is affected by the slip-out. This would be replaced with approximately 4,556 square feet of new asphalt, including the failed pavement area. The finished roadway would be restored to its original width of approximately 20 feet wide.
2 documents in project
| Type | Lead/Public Agency | Received | Title |
|---|---|---|---|
| NOD | San Mateo County | Slip-out Repair and Bank Stabilization Near 1780 Higgins Canyon Road Project (Lake or Streambed Alteration Agreement No. EPIMS-SMO-55946-R3. | |
| NEG | San Mateo County Department of Public Works | Slip-out Repair and Bank Stabilization Near 1780 Higgins Canyon Road Project |