SCH Number 2024120741
Project Info
- Title
- Locke Multi-Benefit Flood Risk Reduction Planning Project
- Description
- The proposed project includes several key actions to improve the Meadows Cross Slough right bank levee (TMXS-R). Geotechnical exploration borings will be conducted to assess the structure and composition of the levee, while bathymetric surveys will collect underwater topographic data 100 feet waterward on either side of the levee. A temporary 10-inch drainage pipeline will be replaced with a permanent 12-inch pipeline constructed within the levee embankment, and two abandoned, corroded steel pipelines will be removed. Additionally, an existing 5 HP electric pump will be upgraded to a 5 or 7.5 HP pump, and aggregate base will be installed along the levee crown. Tree trimming will occur as necessary to facilitate access for equipment during geotechnical borings and other ground-disturbing activities.
2 documents in project