Power Santa Clara Valley Project
Description
The Approved Project consists of two new high-voltage direct current (HVDC) terminals, an approximately 11.8-mile underground transmission line connecting the new HVDC terminals, and an approximately 100-foot overhead transmission tie line to connect one of the new HVDC terminals to the existing PG&E San Jose B Substation. Since the Approved Project’s Grove HVDC Terminal site is directly adjacent to the PG&E Metcalf Substation modification area, the overhead Metcalf to Grove 500 kV transmission tie line from the LSPGC dead-end structure within the terminal site to a PG&E-owned dead-end structure inside the proposed PG&E Metcalf Substation modification area will only be approximately 200 feet long. Connection to the PG&E Metcalf and PG&E San Jose B substations will require PG&E to modify the existing PG&E Metcalf Substation and expand and upgrade the existing PG&E San Jose B Substation.
Download CSV New Search

 

4 documents in project

Type Lead/Public Agency Received Title
California Public Utilities Commission (CPUC) Power Santa Clara Valley Project
California Public Utilities Commission (CPUC) Power Santa Clara Valley Project
California Public Utilities Commission (CPUC) Power Santa Clara Valley Project
California Public Utilities Commission (CPUC) Power Santa Clara Valley