SCH Number 2023110218
Project Info
- Title
- SCE Cal City Substation 115 kV Upgrade Project
- Description
- The Project as proposed would include upgrading the transformers at the existing Cal City Substation from 33/12 kV to 115/33 kV and 115/12 kV; and construction of two new 115 kV subtransmission lines, the Kramer–Cal City Subtransmission Line, from Kramer Substation to Cal City Substation, and the Cal City–Edwards-Holgate Subtransmission Line, from Cal City Substation to Holgate Switchyard. The proposed Cal City–Edwards-Holgate 115 kV Subtransmission Line would also include a tap line to serve Edwards Substation located on EAFB. Fourteen new underground 12 kV distribution getaways and two new underground 33 kV distribution getaways from Cal City Substation are also proposed along with installation of telecommunication cable on both new 115 kV subtransmission lines and telecommunication improvements at the existing Holgate Switchyard and Cal City, Kramer, and Edwards Substations.
2 documents in project
