SCH Number 2023090001
Project Info
- Title
- McClellan-Bell Substation Upgrade Project
- Description
- The McClellan-Bell Substation Upgrade Project (Project) consists of replacing an idle and aging 37.5-megavolt-ampere (MVA) transformer located adjacently to the west side of the perimeter wall. An identical 37.5-MVA transformer will be placed in the same location along with a high side circuit breaker, disconnect switches, and an associated H-frame placed just south of the transformer. The existing current/potential transformers (CT/PT), CT/PT H-frame, and four light poles will be removed from the substation. Other substation upgrades include a new battery enclosure to the north of the transformer and a 14-foot-wide entry gate installed along the east side of the perimeter wall with access from Bell Avenue. New concrete foundations will be constructed for the H-frame, circuit breaker, and battery enclosure along with the installation of new ground grid, conduit, and potential grounding wells. Paving of the ground surface within the substation may also occur as part of the substation upgrades.
1 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOE | Sacramento Municipal Utility District | McClellan-Bell Substation Upgrade Project |