SCH Number 2023010059


Project Info

Title
San Gabriel Water Company
Description
The Fontana Water Company (FWC) Regional Domestic Water Facilities will be located on the existing FWC Plant F7 on Cherry Avenue, as shown on the attached figure. The FWC Regional Domestic Water Facilities being proposed are a 551 gallon per minute domestic water well, a 2.15 million gallon domestic water above ground steel storage reservoir, a 4,551 gallon per minute domestic booster station and 4,240 lineal feet of 16-inch diameter domestic water transmission main along Cherry Avenue that will connect to the FWC Juniper Pressure Zone south of the site. The proposed domestic water well will take groundwater from the FWC Baseline Zone and will be stored in the water storage reservoir. The booster station will pump the stored water through the 16-inch domestic water transmission main into the FWC Juniper Zone. The Regional Domestic Water Facilities will provide service to the Speedway Commerce Center II and will also serve the unincorporated area of San Bernardino County that is within the Fontana Water Company service area. The estimated population that will be served by the Regional Domestic Water Facilities in the unincorporated area of San Bernardino County is 40,000 with an estimated area of 4,450 acres. The project schedule is two (2) years with estimated completion by October 2024.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
State Water Resources Control Board Operation of San Gabriel Water Company Fontana's Well F-07C Water Supply Permit Amendment
San Bernardino County San Gabriel Water Company