SCH Number 2022120255


Project Info

Title
Burlingame WWTF Digester Improvements Project
Description
The City of Burlingame (City) owns a WWTF with a permitted design flow of 5.5 million gallons per day (mgd) on an average dry weather flow (ADWF) basis. The Plant provides secondary treatment of wastewater and discharges the treated effluent to the North Bayside System Unit force main, which ultimately discharges into Lower San Francisco Bay via a deep-water outfall. The City’s WWTP uses anaerobic digestion to stabilize sludge prior to dewatering by a belt filter press or centrifuge before the dewatered sludge is trucked off site to a landfill or land application site for disposal. The existing anaerobic digestion facilities, which include two digesters, a sludge storage tank, and an equipment room, are aging and require replacement to improve the overall performance and reliability of the anaerobic digestion process. Construction of the Proposed Project is planned to start on September 1, 2023 and will take approximately 30 months of continuous work to complete.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
State Water Resources Control Board, Divison of Financial Assistance Wastewater Treatment Facility Digester Improvements Project
City of Burlingame Burlingame WWTF Digester Improvements Project