SCH Number 2022120105
Project Info
- Title
- City of Santa Maria Well 6S Intertie
- Description
- The City of Santa Maria Utilities Department is proposing to develop the connection of the City’s existing groundwater Well 6S to the groundwater header line located at Well 11S, located along Airpark Drive. This pipeline connection would be approximately 2,020 feet long and consist of an 18-inch ductile iron pipe. No structural development is proposed. There is one jack and bore section proposed across an existing open earthen drainage channel/creek on airport property to advance pipeline construction from south to north. The purpose of the bore is to avoid excavation in proximity to the creek.
2 documents in project