SCH Number 2022110449
Project Info
- Title
- Homestead Substation Rebuild Project
- Description
- SVP is proposing the Homestead Substation Rebuild Project, which would rebuild the existing Homestead Substation within the existing substation site near the intersection of Homestead Road and Kiely Boulevard in the City of Santa Clara. The substation site is separated from the roadways by existing commercial and multi-family residential buildings and does not front on a public right of way. The project would replace the existing substation in its entirety and would increase substation capacity to deliver 12 kilovolt (kV) distribution power within the substation’s service area. An existing 60 kV transmission line provides power to the substation; the line would be relocated within the substation property and unneeded poles and conductor would be removed. The packed rock surface of the property would be paved in asphalt after grading. Construction is estimated to take approximately 30 months and would occur in two phases.
2 documents in project