SCH Number 2021120485
Project Info
- Title
- Unit W Wastewater Interceptor Condition Assessment
- Description
- The proposed project involves inspection of valves and replacement (as required) at lower Unit W junction structures to facilitate operation and bypassing wastewater flow for internal condition assessment, temporary installation of wastewater bypass pipes to empty the pipelines prior to insertion of the closed-circuit television (CCTV) equipment, installation of pipe access tee fittings on the existing Unit W pipelines to provide access for the CCTV equipment, temporary improvement of four existing maintenance road creek crossings (South Fork Arroyo Conejo) to facilitate access by vehicles and equipment, internal cleaning of the pipelines as needed and inspection of the internal pipe condition using CCTV equipment.
3 documents in project
| Type | Lead/Public Agency | Received | Title |
|---|---|---|---|
| NOD | City of Thousand Oaks | The Unit W Wastewater Interceptor Condition Assessment Project (Streambed Alteration Agreement No. EPIMS-VEN-26963-R5) | |
| NOD | City of Thousand Oaks | Unit W Wastewater Interceptor Condition Assessment Project (Lake or Streambed Alteration Agreement EPIMS No. VEN-26963) | |
| MND | City of Thousand Oaks | Unit W Wastewater Interceptor Condition Assessment |
